CME (Civil, Mechanical, Electrical)

AKTIVITAS CIVIL WORKS :

  1. Penyusunan Design Criteria 
  2. Proses survey site CME
  3. Design & Bill of Quantity
  4. Pekerjaan implementasi (site work) = bikin tower, shelter, AC, dll.
  5. Testing and Commissioning
Diagram Proses Pekerjaan Sipil dalam Pembangunan Infrastruktur Telekomunikasi Selular
CW SITE SURVEY → DESIGN AND DRAWING → DESIGN BILL OF QUANTITY → IMPLEMENTATION WORK → TESTING AND COMMISSIONING → AS-BUILT DOCUMENTATION

CRITICAL CRITERIA
  • antena type and number
  • size and number of cabinet, BBS, TRM will be installed in
  • Air conditioning
  • Electrical panel (PDB)
  • Power Consumption requirement
INFORMASI PENTING
  • Kondisi tanah (GF), atau kondisi bangunan (RT)
  • Topografi dan elevasi tanah
  • access to site
  • surrounding site, nearest building/structure, etc
DESIGN PACKAGE HARUS MENGANDUNG :
  1. site map
  2. site layout
  3. view, cross section of proposal site
  4. foundation of base frame design
  5. power cable
  6. grounding system, etc

Tidak ada komentar:

Posting Komentar

 
Parasadya Paramatatva Cisya © 2012 | Designed by LogosDatabase.com, in collaboration with Credit Card Machines, Corporate Headquarters and Motivational Quotes