AKTIVITAS CIVIL WORKS :
- Penyusunan Design Criteria
- Proses survey site CME
- Design & Bill of Quantity
- Pekerjaan implementasi (site work) = bikin tower, shelter, AC, dll.
- Testing and Commissioning
Diagram Proses Pekerjaan Sipil dalam Pembangunan Infrastruktur Telekomunikasi Selular
CW SITE SURVEY → DESIGN AND DRAWING → DESIGN BILL OF QUANTITY → IMPLEMENTATION WORK → TESTING AND COMMISSIONING → AS-BUILT DOCUMENTATION
CRITICAL CRITERIA
- antena type and number
- size and number of cabinet, BBS, TRM will be installed in
- Air conditioning
- Electrical panel (PDB)
- Power Consumption requirement
INFORMASI PENTING
- Kondisi tanah (GF), atau kondisi bangunan (RT)
- Topografi dan elevasi tanah
- access to site
- surrounding site, nearest building/structure, etc
DESIGN PACKAGE HARUS MENGANDUNG :
- site map
- site layout
- view, cross section of proposal site
- foundation of base frame design
- power cable
- grounding system, etc